- Client: The Government of the Republic of Uganda
- Country: Uganda
- Location: Buseruka sub-county, Hoima District.
- Start date: March 2018
- Project Duration: 48 Months
- Project Status: Ongoing
Project Description
The development consists both of buildings and runway infrastructure. The Runway is 3.5m by 45m with 2 shoulders of 15m, a run way strip width of 300m, a taxiway of 190m length with width of 26m and 60m including shoulders for code F compliance. The buildings include the Cargo terminal which is 3240sqm, Employee housing, an Electrical main substation and a Fuel farm. The design included the landslide road system to protect the infrastructure from soil covers.
Actual Services Provided by Armstrong Consulting Engineers
Preparation of Civil and Structural Engineering designs: Managing the Client’s budget: Quality checks: Supervision of Construction works: Ensuring health and safety compliance: Assessing sustainability and environmental impact. Ensuring project packages meet the agreed specifications.